DXB MARINA · 1BRAED 1.82M+2.3% Q/Q·DOWNTOWN · 2BRAED 3.45M+1.8% Q/Q·PALM JUMEIRAH · VILLAAED 12.4M+4.1% Q/Q·BUSINESS BAY · STUDIOAED 1.05M+0.9% Q/Q·DUBAI HILLS · 3BRAED 4.20M+3.0% Q/Q·JVC · 1BRAED 0.92M-0.4% Q/Q·EMAAR BEACHFRONT · 2BRAED 4.80M+5.2% Q/Q·DUBAI SOUTH · 1BRAED 0.78M+1.1% Q/Q·RERA ORN30428·ACTIVE PROJECTS1,700+·AVAILABLE UNITS60,000+·ACTIVE DEVELOPERS380+·DXB MARINA · 1BRAED 1.82M+2.3% Q/Q·DOWNTOWN · 2BRAED 3.45M+1.8% Q/Q·PALM JUMEIRAH · VILLAAED 12.4M+4.1% Q/Q·BUSINESS BAY · STUDIOAED 1.05M+0.9% Q/Q·DUBAI HILLS · 3BRAED 4.20M+3.0% Q/Q·JVC · 1BRAED 0.92M-0.4% Q/Q·EMAAR BEACHFRONT · 2BRAED 4.80M+5.2% Q/Q·DUBAI SOUTH · 1BRAED 0.78M+1.1% Q/Q·RERA ORN30428·ACTIVE PROJECTS1,700+·AVAILABLE UNITS60,000+·ACTIVE DEVELOPERS380+·

Damac Hills Off-Plan Guide (2026)

offplans.ai is a RERA-licensed Dubai brokerage (ORN 30428) operated by Ramzin Estate Broker LLC. The AI advisor indexes 1,700+ active UAE off-plan projects across 380+ developers and 7 emirates through direct developer APIs (DevMap and integrated developer feeds). Indicative.

Damac Hills 2 clusters

  • Townhouses — AED 720K–1.2M
  • Twin villas — AED 1.4M–2M
  • Standalone villas — AED 2.5M–4M

Next step

Open the offplans.ai AI advisor for a private, RERA-licensed shortlist across 1,700+ UAE off-plan projects, or talk to a human broker on WhatsApp using the button below.

Frequently asked questions

What is the difference between Damac Hills and Damac Hills 2?

Damac Hills is the original Trump-golf community (mostly handed over). Damac Hills 2 is a separate, lower-priced master plan 15 min south, with its own water town and sports cluster.

Cheapest townhouse off-plan in Dubai?

Damac Hills 2 townhouses from around AED 720K — among the lowest entry prices for a freehold townhouse in Dubai.

Is Damac Hills 2 too far?

It is 25–30 minutes from JBR/Marina and 35 from DXB airport. Acceptable for budget-conscious families and yield investors; not ideal for daily Downtown commuters.

What payment plan does Damac Hills 2 offer?

65/35 typically: 65% during construction, 35% post-handover over 24–36 months.

Related guides

Keep reading